WHEN THE AUXILIARY POWER UNIT (APU) GENERATOR IS OVERLOADED ON THE GROUND:
AAll Commercial sub-buses are shed.
BGalleys & cabin related buses are shed.
CAll galleys are powered.
相关试题
-
WHEN THE AUXILIARY POWER UNIT (APU) GENERATOR IS OVERLOADED ON THE GROUND:
-
On ground,the aircraft can be supplied by an electrical ground power unit.
-
A secondary system used to estimate the fuel quantity when the aircraft is on the ground.
-
THE GROUND POWER CONTROL PANEL IS LOCATED:
-
nel of the power source unit to OFF when it is not in use B. checking the repeaters with the master